Koulouba housing block
Ouagadougou · Work package 02
Material delivery
Delivery note BL-0842
Cement CPJ 45
250 bags · 12.5 t
- Evidence status
- Delivery note attached
- Attachments
- 3 photos
- Recorded at
- 28 Aug · 09:14
100% offline-first field capture, eliminate hidden waste (4% to 8%), and automatically compute your real margins site by site.
Across Sahelian and West African construction, between 4% and 8% of project budgets evaporate in unjustified fuel burns, non-conforming deliveries, and ghost hours.
14 000 000 FCFA à 28 000 000 FCFA
Surconsommation gasoil, écarts pont-bascule, heures fantômes.
+21 000 000 FCFA
✔ Rapprochement SYSCOHADA & QR code en temps réel
Sécurisez vos marges opérationnelles dès le prochain approvisionnement.
Essayer gratuitement→Your foremen and timekeepers record deliveries, fuel slips, and attendance directly on their Android smartphones, even in dead zones. Everything syncs automatically when network returns.
Works without network in remote locations. Zero field downtime.
Every delivery is backed by a photo of the signed receipt and the actual tally.
No more crumpled paper notes and manual double-entry at the office.
Koulouba housing block
Ouagadougou · Work package 02
Material delivery
Delivery note BL-0842
Cement CPJ 45
250 bags · 12.5 t
Direct logging of deliveries, fuel usage, and attendance without depending on 4G.
Strict verification of delivered vs invoiced volumes, precise equipment tracking, and an end to silent theft.
Continuous tracking of cost prices and instant comparison with budgeted cost estimates.
Attendance for local crews, daily advance tracking, and automated withholding applications.
Without explicit permission from the construction firm, no one else sees anything. The firm decides what to share on a project-by-project basis, and can revoke access at any time.